BTeV Interaction Region Director’s ReviewFebruary 18-19, 2004Introductory Executive SessionL. Edward Temple, JrOutline• Charge• Agenda• Timeline• Committee Assignments• Closeout & Report Structure• Report Format• Discussion18-Feb-04 BTeV IR Director's Review 2Charge for a Director’s Review of the BTeV’s Interaction Region February 18-19, 2004 This charge is for the Committee to conduct a Director’s Review of the proposed BTeV Charge Project’s Interaction Region (IR) work scope at Fermilab. Since the IR work had been added just prior to the October 21-23, 2003 CD-1 Director’s Review, its technical design and cost & schedule estimates were considerably less developed than those of the detector portion of the project. Based on that review the Committee recommended that a follow-up Director’s CD-1 Review be conducted on the IR work scope. Approval of CD-1 will allow the expenditure of funds for design to proceed from the Conceptual Design phase to the more detailed design phase. Approval of CD-1 by DOE officials is based on a Conceptual Design for the project, a cost and schedule baseline range, and some additional project management documents. The Conceptual Design Report is developed during the conceptual exploration and design process and is the document that identifies the requirements of the project and the concept for fulfilling those requirements. It presents the key performance parameters that form the basis of the Performance ...

Informations

Publié par
Nombre de lectures 40
Langue Slovak

Extrait

BTeV Interaction Region
Director’s Review
February 18-19, 2004
Introductory Executive Session
L. Edward Temple, Jr
18-Feb-04
BTeV IR Director's Review
2
Outline
• Charge
• Agenda
• Timeline
• Committee Assignments
• Closeout & Report Structure
• Report Format
• Discussion
18-Feb-04
BTeV IR Director's Review
3
Charge for a Director’s Review of the BTeV’s Interaction Region
February 18-19, 2004
This charge is for the Committee to conduct a Director’s Review of the proposed BTeV
Project’s Interaction Region (IR) work scope at Fermilab. Since the IR work had been
added just prior to the October 21-23, 2003 CD-1 Director’s Review, its technical design
and cost & schedule estimates were considerably less developed than those of the
detector portion of the project. Based on that review the Committee recommended that a
follow-up Director’s CD-1 Review be conducted on the IR work scope. Approval of CD-
1 will allow the expenditure of funds for design to proceed from the Conceptual Design
phase to the more detailed design phase.
Approval of CD-1 by DOE officials is based on a
Conceptual Design
for the project, a
cost and schedule baseline range
, and some additional project management documents.
The Conceptual Design Report is developed during the conceptual exploration and design
process and is the document that identifies the requirements of the project and the
concept for fulfilling those requirements. It presents the key performance parameters that
form the basis of the Performance Baseline and the technical solutions that address them.
These will be the focus of the review and they, in turn, form the basis for the Work
Breakdown Structure and the cost and schedule. The committee is asked to review the
proposed conceptual design for its ability to address the requirements and for its technical
soundness, and it should assess the cost and schedule. The committee should also look at
proposed long lead time procurements that would significantly speed up the project if
they were funded early. The committee should also comment on the status of the formal
management documentation required for CD1. Also, please evaluate BTeV responses to
IR recommendations from the October 21-23, 2003 Director’s Review.
An additional Director’s CD-1 Review of the entire BTeV Project is scheduled for March
30-April 1, 2004 and a Lehman Review corresponding to a DOE CD-1 Review has been
scheduled for April 27-29, 2004. Therefore, a key purpose of this review is to
assess the
progress and readiness of the BTeV Project’s IR work scope for a Lehman CD-1
Review
. Constructive comments on presentation content, format, and style are requested.
Finally, the committee should present findings, comments, and conclusions at a closeout
meeting with BTeV and Fermilab management and provide a written report soon after the
review.
Charge
18-Feb-04
BTeV IR Director's Review
4
Director's Review of BTeV Interaction Region
February 18-19, 2004
Agenda
Wednesday, February 18 (Comitium)
8:30am - 9:00am
Executive Session
Committee
30 mins
9:00am - 9:15am
Introduction
M. Church
15 mins
9:15am - 10:00am
Accelerator Physics (w ill include
Comments on Dynamic Aperture)
J. Johnstone
45 mins
10:00am- 10:15am
Beam Halo
N . Mokhov
15 mins
10:15am- 10:30am
Break
10:30am- 11:05am
LHC Style Quadrupoles
D. Chichili
35 mins
11:05am- 11:40am
Spools
J. Tompkins
35 mins
11:40am- 11:55am
Pow er Supplies
G. Krafczyk
15 mins
11:55am- 12:15pm
Discussion
12:15pm- 1:00pm
Lunch
1:00pm - 1:25pm
Cryogenic Layout and Design
J. Theilacker
25 mins
1:25pm - 1:40pm
QPM Layout and Design
S. Lackey
15 mins
1:40pm - 2:00pm
Conversion of C0 to Normal
P. Garbincius
20 mins
Straight Section
2:00pm - 2:35pm
Cost and Scheduling of Magnet
Fabrication
J. Kerby
35 mins
2:35pm - 3:10pm
Cost and Scheduling of Remaining
Items
M. Church
35 mins
3:10pm - 3:30pm
Discussion/ Break
3:30pm - 5:00pm
Breakout Sessions
90 mins
Session 1: Accelerator Physics Issues
Session 3: Installation
5:00pm - 6:30pm
Executive Session
Committee
90 mins
Thursday, February 19
8:00am - 9:30am
Breakout Sessions
90 mins
Session 2: Technical Components
Session 4: Management, Cost and Schedule
9:30am - 12:15pm
Executive Session/ Report Write-up
165 mins
12:15pm- 1:15pm
Working Lunch
1:15pm - 2:30pm
Closeout Dry Run
2:30pm - 3:00pm
Equipment Check
3:00pm - 4:00pm
Closeout w ith BTeV Management
4:00pm -
Adjourn
Agenda
18-Feb-04
BTeV IR Director's Review
5
BTeV Timeline
11/03
12/03
1/04
2/04
3/04
4/04
5/04
6/04
7/04
8/04
9/04
10/04
11/04
12/04
10/03
1/05
Director’s Review
for CD-1
Oct 21-23, 2003
Performance Management
System Review
May 2004
AE Approves
CD-1
June 2004
SC1/AE Approves
Acquisition Strategy
May 2004
SC1/AE Approves
CD-0
March 2004
DOE Review
for CD-1
April 27-29, 2004
Director’s
Review on IR
Feb. 18-19, 2004
Director’s
Review for CD-1
March 30-April 1, 2004
AE Approves
CD-3
Dec. 2004
Construction Start
Dec. 2004
DOE Review
for CD-3
Nov. 2004
Director’s Review
for CD-3
Oct. 2004
DOE Review
for CD-2/3a
August 2004
EIR
Sept. 2004
AE Approves
CD-2/3a
October 2004
Director’s Review
for CD-2/3a
July 2004
18-Feb-04
BTeV IR Director's Review
6
Committee Assignments
Jim Strait, Dave Finley
Cost
1.5
Jie Wei, Ed Temple
Management
1.6
Ed Temple
Executive Summary
Schedule
Installation and Operations
Accelerator Physics and IR
Optics
IR Magnets
1.4
1.3
1.2
1.1
Dean Hoffer, Jerry Annala,
Don Edwards
Dave Finley, Jerry Annala
Don Edwards, Jie Wei
Jim Strait, Jerry Annala
Each group/person should address elements of the Charge for their area.
18-Feb-04
BTeV IR Director's Review
7
Closeout & Report Structure
• Review findings, assessments, and
recommendations should be presented in
writing at a closeout with the Collaboration
and Fermilab management.
• Written with
– Findings
– Comments and
– Recommendations
18-Feb-04
BTeV IR Director's Review
8
Findings, Comments, and Recommendations
• Findings
• Comments
• Recommendations
Findings are statements of fact that summarize
noteworthy information presented during the review.
Comments are judgment statements about the facts
presented during the review. The reviewers'
comments are based on their experiences and
expertise.
The comments are to be evaluated by the project
team and actions taken as deemed appropriate.
Recommendations are statements of actions that
should be addressed by the project team.
A response to the recommendation is expected and it
is expected that the actions taken would be reported
on during future reviews.
18-Feb-04
BTeV IR Director's Review
9
Report
Format
REPORT OUTLINE
Executive Summary...............................................................................................................
1. BTeV Interaction Region Plan.........................................................................................
1.1
Interaction Region Magnets ...................................................................................
1.2
Accelerator Physics and Interaction Region Optics...............................................
1.3
Installation and Operations.....................................................................................
1.4
Schedule .................................................................................................................
1.5
Cost
1.6
Management ...........................................................................................................
Appendices
18-Feb-04
BTeV IR Director's Review
10
Report
Format
(Continued)
PLEASE USE THE FOLLOWING FORMAT FOR
YOUR HAND-WRITTEN OR TYPED INPUT FOR THE DRAFT REPORT
Your Name
Version Number or Date/Time
1.1
(Section you are writing)
Findings
Include an assessment of technical, cost, schedule, and management
Comments
Recommendations
1
Begin with action verb.
2
3
4
18-Feb-04
BTeV IR Director's Review
11
Discussion
• Questions and Answers