BTeV Interaction Region Director’s ReviewFebruary 18-19, 2004Introductory Executive SessionL. Edward Temple, JrOutline• Charge• Agenda• Timeline• Committee Assignments• Closeout & Report Structure• Report Format• Discussion18-Feb-04 BTeV IR Director's Review 2Charge for a Director’s Review of the BTeV’s Interaction Region February 18-19, 2004 This charge is for the Committee to conduct a Director’s Review of the proposed BTeV Charge Project’s Interaction Region (IR) work scope at Fermilab. Since the IR work had been added just prior to the October 21-23, 2003 CD-1 Director’s Review, its technical design and cost & schedule estimates were considerably less developed than those of the detector portion of the project. Based on that review the Committee recommended that a follow-up Director’s CD-1 Review be conducted on the IR work scope. Approval of CD-1 will allow the expenditure of funds for design to proceed from the Conceptual Design phase to the more detailed design phase. Approval of CD-1 by DOE officials is based on a Conceptual Design for the project, a cost and schedule baseline range, and some additional project management documents. The Conceptual Design Report is developed during the conceptual exploration and design process and is the document that identifies the requirements of the project and the concept for fulfilling those requirements. It presents the key performance parameters that form the basis of the Performance ...